103rd AOG Site Survey; Another Step Toward Full Operational Capability
Dave McKenzie and James Luebbe from the AOC Weapons System Integrator team review infrastructure requirements with Conn. Air National Guard leadership during the building site visit on Thursday, Feb. 4, 2010. The walkthrough was part of a four-day site survey to determine the Conn. Air National Guard’s level of readiness to accept and support the installation of a 2.5 million dollar equipment suite that will enable the 103rd Air and Space Operations Group to achieve its initial operational capability. (U.S. Air Force photo by Tech. Sgt. Joshua A. Mead)
PHOTO BY:
Tech. Sgt. Joshua A. Mead
VIRIN:
100204-F-7430M-023.JPG
FULL SIZE:
2.75 MB
CAMERA
N/A
LENS
N/A
APERTURE
N/A
No camera details available.
IMAGE IS PUBLIC DOMAIN
Read More
This photograph is considered public domain and has been cleared for release.
If you would like to republish please give the photographer appropriate credit.
Further, any commercial or non-commercial use of this photograph or any other
DoD image must be made in compliance with guidance found at
https://www.dimoc.mil/resources/limitations,
which pertains to intellectual property restrictions (e.g., copyright and
trademark, including the use of official emblems, insignia, names and slogans), warnings
regarding use of images of identifiable personnel, appearance of endorsement, and related matters.